Friday, October 23, 2015

Kitchen Flooring is Done!

The house remodeling continues...

After 15 years of HATING the heat vent in our kitchen, it is finally moved.

The heat vent was right in front of the oven. With a golden retriever shedding, this was always unpleasant. As soon as I would start cooking, the AC or the heat would turn on. Then all her dog hair would blow right up into whatever I was cooking. Oh yes... that was infuriating!

So, I was crossing off major house projects on the list and I finally came to the kitchen flooring. I knew this was my chance to get that vent moved! I can't believe I am telling you this, but I happily paid $300 to move that vent less than 6 feet. It is now near the wall and out of the main walkway. It never blows dog hair into my cooking. In fact it does not interfere with our kitchen table or chairs either. Oh happy day!

Then the flooring went in. The flooring itself was easy. Moving that HUGE refrigerator was not so easy. You cannot move the fridge into another room without taking the doors off. It is so much bigger than the doorway on both sides. But after much outside of the box thinking, we discovered that it would be less risk and pain in the butt to take the washer and dryer out of the room and put the fridge in the laundry nook.  Since the washer and dryer both fit thru the doorway and the shelving in there was easily removed, we took it all out and shoved the fridge in there for a day.  It just BARELY fit.

The flooring got done and then I moved the fridge, washer, and dryer back in place. This was such a huge undertaking, but I am so glad it is done. Everything is reinstalled and clean. It all looks brand new!

Here is how it turned out:


I am so happy with the results. The moving of the vent was the best $300 home improvement ever!